Where does energy go in a plastic pipe unit in Ramnagar?

Into the extrusion line, run on grid electricity. TERI's profile of the Ramnagar plastics cluster puts its 20 pipe and fitting units at 1,755 of the cluster's 2,860 toe a year, over 60%. Power comes from PUVVNL, with diesel in DG sets through frequent power cuts.

Inside the line

Fuels besides the grid

Across the cluster, high speed diesel runs DG sets during power failures, and used engine oil and LPG are also burned. Electricity is about 84% of the cluster's energy.

How the bill is built

Most units take supply from PUVVNL under tariff HV-2, a two-part tariff billed on maximum demand and kVAh. TERI found power factor at the main incomer between 0.95 and 0.97; automatic power factor correction cuts kVAh billed for the same work.

What to fix first

An average pipe unit (estimate)

Averages from a 2016 cluster profile; your own bills give the real figure.

What Senseible does here

Senseible reads PUVVNL bills, using the printed kWh on kVAh bills, and DG diesel invoices into monthly CO2 for your unit, so you can see whether a heater or drive change moved it.

Sources: TERI and SAMEEEKSHA, Cluster profile: Ramnagar plastic industries, CEA CO2 Baseline Database for the Indian power sector, version 22.0