Is site-mixed concrete higher or lower carbon than ready-mix concrete?

Start with the cement per cubic metre in each mix, times the supplier's factor. Then add mixing energy: site mixer diesel at 2.68 kg CO2 per litre, and for ready mix the plant electricity and truck mixer diesel.

What decides it

Evidence for each

Ready mix suppliers can give batch tickets with cement and blend per load. For site mixing, divide cement bags used by cubic metres poured over the same period.

Which scope

A site mixer the contractor runs is Scope 1. Bought ready mix, including its plant and delivery, is Scope 3 purchased goods.

Worked example: per cubic metre (illustrative inputs)

Values are illustrative; use batch tickets, cement issue records and the cement supplier's factor.

What Senseible does here

Senseible reads diesel invoices, fuel slips and site electricity bills into a dated, fingerprinted record per project, so a contractor can hand a client Scope 1 and 2 figures with the document behind each line. Estimates from hours or distance are labelled as estimates.

Sources: GHG Protocol Corporate Value Chain (Scope 3) Standard, IPCC 2006 Guidelines, Volume 2 Energy (fuel defaults), CEA CO2 Baseline Database, version 21.0

Last reviewed 2026-10-21.