Why do the Bureau of Energy Efficiency (BEE) Odisha sponge iron reports for 25, 40 and 60 horsepower crusher motors print three different carbon dioxide (CO2) factors?

BEE's Odisha sponge iron reports swap a rewound crusher motor for a 92 to 94% efficient one, saving 6,814, 12,040 and 21,073 kilowatt hours (kWh) a year, for motors costing rupees (Rs) 0.65, 1.11 and 1.79 lakh. Payback is about 2.2 to 2.4 years, printed as months. The CO2 lines imply 1.76, 1.16 and 0.76 kilograms a kWh.

The three reports side by side

The payback is in years, not months

The summary tables print 2.45, 2.36 and 2.18 under a "Months" heading. The sums say years: Rs 0.65 lakh / Rs 0.27 lakh is 2.4 years, Rs 1.11 / 0.47 is 2.4 and Rs 1.79 / 0.82 is 2.2. The 25 and 60 HP texts agree, "Two Year & Four Months" and "Two Years Two Months". The 40 HP text says "One Year Eight Months", which fits neither its 2.36 nor its own cost and benefit.

Three CO2 factors in three reports

The reports print 12, 14 and 16 tonnes a year and give no factor. Divided by the kWh saved, that is 1.76, 1.16 and 0.76 tonnes a megawatt hour. They cannot all be right for the same grid. At the Central Electricity Authority (CEA) factor for financial year (FY) 2025-26, 0.675 kilograms a kWh, the same kWh give 4.6, 8.1 and 14.2 tonnes. This is Scope 2, grid power not bought.

Other printed figures that do not tie

What to take from it

The 40 HP report, rebuilt

Printed lines are the report's own at the report year's prices. The 0.675 is the CEA version 22.0 grid factor for FY 2025-26, an estimate of today's saving.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so your kiln's power by month is on file. It cannot split one motor out of the bill; use a clamp reading for that.

Sources: BEE, Detailed project report: energy efficient motor, crusher section, 25 HP, Orissa sponge iron cluster (SAMEEEKSHA), BEE, Detailed project report: energy efficient motor, crusher section, 40 HP, Orissa sponge iron cluster (SAMEEEKSHA), BEE, Detailed project report: energy efficient motor, crusher section, 60 HP, Orissa sponge iron cluster (SAMEEEKSHA), Central Electricity Authority (CEA), CO2 Baseline Database for the Indian Power Sector

Last reviewed 2026-11-05. Report figures are from BEE's Small and Medium Enterprises (SME) programme project reports, with electricity at Rs 3.90 a kWh. Check your tariff, your motor's measured kW and a current quote before you rely on the payback.