Senseible

In the Alwar manual's chart, how much of an oil mill's electricity is lighting, and is it worth fixing first?

In one chart in the Bureau of Energy Efficiency (BEE) Alwar manual, lighting is 5% of the electricity. Kolhu motors are 47% and expeller motors 48%. Its lighting steps save 94,185 kilowatt hours (kWh) a year, about a tenth of that 5%. The halogen and roof sheet rows repay fastest; the other lighting rows take 12 to 27 months.

What the manual's chart shows

What 5% is in kilowatt hours

A kilowatt hour (kWh) is the unit on your electricity bill, the way a litre is the unit for diesel. The manual gives about 186 lakh kWh a year for the Alwar and Sawai Madhopur mills together. A lakh is 100,000, so that is 18,600,000 kWh.

Five per cent of 18,600,000 is 930,000 kWh. That is lighting, if the chart holds for the cluster.

What the lighting steps in the manual save

What that adds up to

What to do first, our reading

Motors are where the kWh are, so a motor swap moves your number most. Lighting rows cost less in rupees. In the manual's table the halogen swap repays in about 2 months and the roof sheets in about 9. The other lighting rows take 12 to 27 months, and the 150 watt row at 27 months is almost as slow as the motors at 30. Eco ventilators (3 months) and the power factor controller (11 months) repay faster than most lights. If a motor swap is out of reach this year, the halogen and roof sheet rows are the lighting steps to look at first. Do both in the order your own bill and your own meter readings support.

An example mill that matches the chart

The 5% share is the manual's chart; the 200,000 kWh is an example. The 7.5% and 10.1% are our ratios from the manual's cluster totals, so a real mill will differ.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so the kWh for each bill you upload is on file by month. The bill shows the whole mill's electricity, not one motor's; for that you need a meter on each line or a few days of readings.

Sources: Bureau of Energy Efficiency (BEE), Manual on energy conservation measures in oil mills, Alwar cluster (SAMEEEKSHA), Central Electricity Authority (CEA), CO2 Baseline Database for the Indian Power Sector, version 22.0 (grid factor 0.675 kg CO2 per kWh, FY 2025-26)

Last reviewed 2026-11-07. Chart share, kWh, rupees and costs are from the BEE Alwar manual at its date and tariff (Rs 4.8 a kWh). The chart's scope (one mill or the cluster) is not stated, so the 930,000 kWh is our reading. Check today's tariff and quotes before relying on any payback.