How much cable voltage drop is allowed in a rooftop solar plant, and what does it cost in units?

The Ministry of New and Renewable Energy (MNRE) specification keeps voltage drop under 2% on the direct current side and limits it to a maximum of 2% on the alternating current side. On the same current, my reading is that each 2% drop costs about 2% of the plant's units.

What the cable clauses say

These are clauses from the technical specification in Annexure 3 of MNRE's guidelines for its residential rooftop solar scheme, Pradhan Mantri Surya Ghar: Muft Bijli Yojana. A factory is not bound by them, but they are a published checklist to hold a quotation against.

Why a voltage drop is lost energy

My reading, from basic electrical law and not printed in the guideline: at the same current, the share of power lost in a cable equals its voltage drop as a share of the voltage. A 2% drop is therefore about 2% of the power passing through. The DC and AC runs lose in turn, so a DC drop at the 2% ceiling and an AC drop of 2% compound to a little under 4%. Clause 9.6 says less than 2%, while clause 9.7 limits the AC drop to a maximum of 2%, so 2% is only reachable on the AC side. Clause 9.6 also applies its limit to several DC segments (array interconnections, array to junction boxes, junction boxes to the inverter). If the limit is read per segment, the total DC drop can be higher; ask for the total.

What to ask the designer

Both runs at the 2% ceiling (example plant)

Plant output is an example. 0.675 kilograms of CO2 per kWh is the Central Electricity Authority grid factor for financial year 2025-26.

What Senseible does here

Senseible reads fuel invoices and electricity bills into monthly records, so your monthly grid units are on file. It does not size cables or measure losses.

Sources: Ministry of New and Renewable Energy (MNRE), Guidelines for PM-Surya Ghar: Muft Bijli Yojana, Central Financial Assistance to Residential Consumers, with Annexures 2 to 4, Central Electricity Authority (CEA), CO2 Baseline Database, India grid factor for financial year 2025-26