Yes, within one electricity division. Since the May 2023 amendment, a consumer with contracted demand or sanctioned load of 100 kW or more, through one connection or several connections in the same electricity division of a discom, can take green energy open access. Captive consumers have no load limit at all.

What changed in 2023

The 2022 Rules allowed green energy open access only to consumers with contracted demand or sanctioned load of 100 kW or more. The Second Amendment Rules, 2023 rewrote the definition: 100 kW or more either through a single connection or through multiple connections aggregating 100 kW or more located in the same electricity division of a distribution licensee.

Conditions to check

Before you apply

List each connection with its consumer number, sanctioned load and division from the bills, and total them. Apply through the central green energy open access portal, which routes the application to the nodal agency your state commission names.

Worked example: three connections in one division

What Senseible does here

Senseible reads sanctioned load and the division or circle printed on each bill, so you can see whether your connections in one division add up to 100 kW before you start the application.