CBAM, BRSR and disclosure rules: questions answered
Pick the question closest to yours.
- 52 of Sundergarh's 87 secondary steel units are PAT designated consumers: what does that mean for the rest?
- A user's share of our captive plant changed during the year. Which shareholding does the rule use?
- An EU fund under SFDR Article 8 asked my Indian company for PAI data. What do I send?
- Are inter-state transmission system losses waived for solar and wind power, or only the charges?
- Can a factory own a battery energy storage system and lease its capacity to others in India?
- Can a factory, shop or office get the PM Surya Ghar rooftop solar subsidy?
- Can a housing society get PM Surya Ghar subsidy for solar on common areas?
- Can group companies meet the Renewable Consumption Obligation together?
- Can I call lab-grown diamonds sustainable or eco-friendly when selling to the US or EU?
- Can I combine several electricity connections to reach 100 kW for green energy open access?
- Can I report only Scope 1 and Scope 2, or do buyers and regulators require Scope 3?
- Can I set a Science Based Targets initiative (SBTi) target on market-based Scope 2 and track progress on location-based?
- Can members of a registered co-operative society run a captive power plant together?
- Carbon audit vs energy audit vs ESG audit: which one does my company need?
- Do a ferrochrome plant's briquetting and pellet plant emissions count?
- Do captive coal power plants have to run at full capacity until December 2026?
- Do green hydrogen and green ammonia plants pay inter-state transmission system charges if commissioned after 2030?
- Do I still need a California SB 261 climate risk report?
- Do India's battery waste rules affect a battery maker's carbon reporting?
- Do India's e-waste recycling targets apply to solar panels, and what must a solar panel maker do instead?
- Do India's e-waste rules cover a micro enterprise, or a factory that only uses a lot of electronics?
- Do Indian rules require factories to replace diesel generator backup with solar and batteries?
- Do Indian suppliers to UK government contracts need a Carbon Reduction Plan?
- Do large hydro projects pay inter-state transmission system charges, and does the award date or the power purchase agreement date decide it?
- Do net metering and open access solar projects have to use ALMM List-II solar cells?
- Do PM Surya Ghar systems have to use Indian-made solar modules?
- Do solar inverters above 200 kW need BIS certification in India?
- Do solar modules on a dairy, coastal or chemical factory roof need extra corrosion tests?
- Does a battery recycler in India earn extended producer responsibility certificates for the waste batteries it imports?
- Does a buyer's code of conduct require me to publish my emissions publicly?
- Does a CPCB red category factory have high carbon emissions?
- Does a partnership or proprietorship firm have to report its carbon emissions?
- Does a rooftop solar plant up to ten kilowatts need the electricity distribution company's feasibility approval, and who sets the size limit for my connection?
- Does a small factory need a BEE certified energy manager?
- Does an EU importer of Egyptian cement need indirect emissions for CBAM?
- Does an EU importer of Vietnamese steel need to be an authorised CBAM declarant?
- Does Buy Clean California require an EPD for Indian steel or glass used in Californian public projects?
- Does California SB 253 apply to an Indian company's US subsidiary?
- Does CSDDD still apply to Indian suppliers after the 2026 Omnibus changes?
- Does ECSBC 2024 apply to a factory or its office block?
- Does Germany's supply chain law make buyers ask suppliers for climate data?
- Does Gujarat reimburse MSMEs for energy and water audits, and what does it cover?
- Does IFRS S2 apply to Indian companies, and what will customers who report under it ask suppliers for?
- Does ISO 14001 now require companies to consider climate change?
- Does my green hydrogen plant need a certificate under India's GHCI scheme?
- Does nickel pig iron count as a precursor for stainless steel made in Fujian?
- Does offshore wind power pay inter-state transmission system charges if the plant is commissioned after 2032?
- Does SECR apply to the UK subsidiary of an Indian company?
- Does Singapore's mandatory climate reporting apply to my Indian group's Singapore company?
- Does the ALMM rule apply to rooftop solar on a factory?
- Does the annual environment statement to the pollution board cover our carbon emissions?
- Does the Bureau of Energy Efficiency (BEE) star label cover my 3 or 5 ton of refrigeration (TR) air conditioner (AC)?
- Does the Ecomark label mean my product is low carbon?
- Does the Energy Conservation Building Code apply to my commercial building?
- Does the EU ban on destroying unsold clothes affect Indian garment exporters?
- Does the EU Battery Regulation's raw material due diligence apply to Indian battery suppliers, and when?
- Does the Greenhouse Gas Protocol Product Standard require assurance of a product footprint, and is verification the only route?
- Does the inter-state transmission system charge waiver reach state-owned lines that carry the power across a state?
- Does the US SEC climate disclosure rule apply to Indian suppliers?
- Does TNFD apply to Indian companies, and how does it relate to BRSR?
- GRI 'in accordance with' versus 'with reference to': which can a small company claim?
- How are precursor emissions added for Ha Tinh blast furnace steel under CBAM?
- How can a company challenge an ESG rating given by a SEBI-registered rating provider?
- How do auto component suppliers answer the climate section of the Drive Sustainability SAQ?
- How do I account for an EU ETS surcharge on my sea freight invoice?
- How do I calculate my plastic packaging EPR obligation in India?
- How do I check flood risk for a factory site in India?
- How do I check whether my installer's solar cells are on ALMM List-II?
- How do I count emissions when old solar panels are recycled in India?
- How do I do a basic climate risk assessment for a small factory?
- How do I do the climate risk and vulnerability assessment for EU Taxonomy DNSH adaptation?
- How do I match my Indian HSN code to the EU CN code for CBAM?
- How do I report GHG emission reductions under GRI 305-5 as a small company?
- How does a re-rolling mill in Sihor work out CO2 per tonne of bars?
- How does a small company write a credible climate transition plan?
- How does a Turkish arc furnace mill count bought DRI or HBI for CBAM?
- How does BEE rate chillers, and what minimum efficiency must a chiller meet?
- How does BEE star rate air compressors?
- How does buying a refurbishing certificate defer an electronics maker's e-waste recycling obligation in India?
- How does the Bureau of Energy Efficiency (BEE) star label rate packaged boilers, and what does it mean for fuel use?
- How does the Ministry of New and Renewable Energy specification size a raised solar structure as its height above the roof increases?
- How does the NCR ban on coal in industry change my unit's emissions report?
- How does the time-of-day electricity tariff work for Indian factories?
- How is a captive user's consumption calculated for the Renewable Consumption Obligation?
- How is EU Taxonomy alignment calculated as a share of turnover, CapEx and OpEx?
- How is the captive limit worked out when a parent company and its subsidiaries draw power from the same plant?
- How long does a producer responsibility certificate stay valid in India, and how much extra can a producer buy, for e-waste, batteries, used oil and construction waste?
- How many appliances does the Bureau of Energy Efficiency (BEE) star label cover, and how many are mandatory?
- How many earth pits and what earth resistance does a rooftop solar plant need under the Ministry of New and Renewable Energy specification?
- How much can a discom charge for standby power under green energy open access?
- How much climate scenario analysis does IFRS S2 expect from a small or first-time reporter?
- How much CO2 has India's PAT scheme saved so far?
- How much does ISO 14001 certification cost an Indian MSME?
- How much of Durgapur's secondary steel energy goes into DRI, and what does CBAM ask of those units?
- How much subsidy does PM Surya Ghar give per kW of rooftop solar?
- How must a battery maker show its extended producer responsibility registration number on batteries, packs and packaging in India?
- How would an Indian textile or food manufacturer apply TNFD's LEAP approach?
- Howrah foundries ship over a million tonnes of castings a year: what carbon data does a unit there need?
- I distribute fuel on the side. Does the Science Based Targets initiative (SBTi) make me set a separate Scope 3 Category 11 target?
- I hold 30% of a group captive plant. Is all the power I draw captive, even above my proportionate limit?